<&>Wellington Corpus of Spoken New Zealand English Version One <&>Copyright 1998 School of Linguistics & Applied Language Studies <&>Victoria University of Wellington <&>side one <&>12:45 so that's the top of the wall mm and that's the top of the receival bin yep <,,> where are the heights going <.>f coming from here on top of the receival bin yeah down to the top of the crusher <,> that gap is two point four so it's two metres down to the <&>13:00 bottom of the legs plus another forty centimetres for clearance okay so we're gonna have the crusher here yep <,,><&>3 in that part there <,> yep that's the <{><[>clearance we need <[>two point <{><[>four <[>two point four right and the legs are <{><[>word <[>two metres long so they'll come down to it <,> yep okay word yes now the crusher's one and a half tall one point five <&>next utterance addressed to himself one point five tut tut word probably <,> two point four of concrete mhm that's concrete in terms <.>of <.>th the size of that concrete pad i was working i reckon the the crusher's about um say two metres long give it a bit of a clearance at each end right how <{><[>long's the receival bin <[><.>and its dimension's are here <.>it's three metres five metres in length three point seven across <{><[>THAT way <[>three point seven <&>14:00 yep <{><[>so if if that pad was three point seven long that'd be fine that'd be loads of room <[><.>and okay we'll probably take it out to there <{><[>that's easy <[>yep yep um and in terms of coming out THIS way well the crusher <.>is let's call it a metre wide but you really want room to get around it each side mm i'll get your layout <,> pad <&>LU walks out of room word <{><[>i've got some dimensions on it <[>okay <&>14:25 <&>silence as LK goes to get the layout <&>15:07 should have them here somewhere <,,><&>6 oh you've done all of this you even went round with a tape measure and measured it up and word right <{><[>oh well we got the same height laughs <[><.>okay that's <{><[>not bad is it <[>word mm okay yeah oh it's it's all basically the same isn't it yeah er what's this so that way that's what i want to know now that's the receival bin with the legs coming down <,,><&>3 not not very straight <,,> <{><[>we can <.>draw <[>we'll do calculations <.>not <,> drawings well i've found all I want laughs they're our concrete legs don't need a pad here at all they can just be sunk in out to the footings oh yeah okay that'll save a bit <.>of <,,><&>3 <.>just yeah <&>16:00 word right a stay up here somewhere yeah <.>dish and if this side on three sides it'll be it'll just have a little wall of say three <.>th you know that tall on the fourth side a ramp so that we can get our forklift down there to pull the crusher up and move it out cos <&>pronounced as cauth if if it's a well completely yeah then we're gonna have to use a crane to move the crusher every time we want to do anything with it chances are we won't want to move it often but if we have a um have that like THAT rather than a wall it's got the same retention but it's a ramp word that needs to be longer <,,><&>3 can you see a problem with that no yeah i <{><[>don't know <[>i mean it's a bit more concrete incidentally we were looking at eric brook's new yeah floor that he's poured down there for a workshop it's it's not got any services underneath it's not got any drains <&>17:00 running through it tut but it's ten <.>met twenty metres by eight metres yeah so and ours is twenty by nine for the winery floor that's right and it's fully reinforced yeah <.>it's i saw <{><[>that when he was building <[>yeah okay so you've seen it two and a half thousand <.>to do that is that all that's all good <{><[>eh? <[>that is CHEAP so we'll put i don't know who did it for him i <{><[>didn't ask <[>i'd think it'd be that much <{><[>just for the concrete <[>just for the materials yeah unless he was just telling lies to lead us on <{1><[1>and that that's got great big poles for the roof and all sorts of things in it I was really impressed sigmund was really <{2><[2>impressed <[1>two and a half thousand dollars yeah <[2>not for the whole building no no no for the <{><[>floor <[>surely not just the floor yep but it's i <.>mean that's just nothing tut i would have <{><[>thought he'd be looking <.>at <[>i'll say it's <{><[>about a hundred and sixty dollars per cubic metre <[>word mhm for concrete and if he's got twenty by eight it's a hundred and sixty <.>ti yeah it's about sixteen cubic metres twenty cubic metres yeah concrete just to start with <,> mm <{><[>and that's three thousand dollars worth so mm must have got <&>18:00 good rates <[>word must be quite a word mm i rang up <{><[><.>abernathy yeah i rang up abernathy's and said tut i'd be interested in going over the drawings and going out to the site and this and that so it will have made HIS weekend <[>cos it IS cheap oh you know the big construction jobs yeah they'll be thrilled yeah i'll say yes i'm not too worried about putting up tenders and all the rest of it because at this stage we're just we were talking about it and we figured you know they were local they they seemed to be quite good quite big and basically we wanted <.>s somewhere to start yeah not wait three weeks to get tenders and things in so that's right <{1><[1>well for these jobs you CAN get the smaller guy in <{2><[2>to do it <[1>yep <[2>mm mm <,> and then we'll yeah we'll see if they <.>want a tender for the big one yeah since we've dealt with them and <{><[>they're very good <[>they've got the expertise yeah should make sure they give you references and all that mm for jobs they've done whether they've done that type of construction <{><[>before with tilt slabs <[>yep oh yeah recommend something go and look at it yeah tilt slab is critical is it it's <{><[>it's there's a skill there that's <.>pretty <[>well a lot of people seem to have a lot of trouble <&>19:00 with them mainly in the lifting cos they crack them <{><[>and they break things <[>and these <.>a these are precast things that you you have lying down with <.>the yeah the footing <{><[>and then you <.>just take them up <[><.>or you pour the floor um you haven't got those <{1><[1>where's that lot of calculations <,,> word <,,><&>3 those calculations that i did are they <{2><[2>around <[1>what's that for <[2>they're yeah they're um <,> just in the room in the bedroom on the <{><[>floor <[>oh i won't worry about it that's too far to go <{><[>and walk now <[>it's just that <.>i yeah you've got your slab poured and you've put some boxing there voc for your wall mhm and then you lift them and they'll probably have to be turned around because you'll have starter bars out of there and then they're put in place there's a bit of site concrete here mhm you put your walls in place put your bars out of it and then you just pour the rest of the floor <&>20:00 tut in there and then you sort of glue it <{><[>together <[>and all the bars are yeah <{><[>and there's bars coming out of voc that one too <[>mm right so it's all tied in hm it's nice it's easy and then your portal frames go up after inside the the angle form of the concrete unit yeah the frame inside yeah <{><[>it's all slabs <[>yep mm okay what else can i tell you <,,> i know all that how far out and that <,,> i don't know exactly how wide the crusher is but it wouldn't be much more than a metre metre twenty <.>s right yep a metre <{><[>one one two say so room to to work in front <.>w there'll be a pump <,,> under but that's not very wide again <.>it's <[>crusher as well will that be <.>in you know the <{><[>must pump <[>be at one end well the way it works is you underneath the crusher you've got a little hopper <{><[>yeah <[>with a screw in it that feeds THIS way and then you take the feed out here and the pump will probably be <.>right sitting beside the crusher parallel to it a portable pump that just sits on the ground <&>21:00 it's voc got wheels yeah it doesn't have to be concreted in right yeah <.>mu it's the must pump but we'll use it for other things <{><[>outside <[>word sits here yep um could could we build in something i mean the power supply and water supply and all that will have to go somewhere er probably under there is a bit wet cos you'll get dripping and things coming down oh it'll go go out the end of the <{><[>crusher or something <[>yeah you want a pole don't you with lights mm mm and power <,> the BEST place for that i would say is probably right on that corner <{><[>there <[>mhm mhm so you can have lights <{><[>out that side <[>it's it's it's yeah AND out this <{><[>side <[><.>sh so we shall we ask for one to be sunk in telegraph pole type of tree trunk yeah and <{><[>and a complex board <[>yeah <&>turns pages maybe after all yeah after all a board doesn't really <{1><[1>matter because it'll be it won't be in the slab at all it'll be just off to the side <{2><[2>it can go in after <[1>mm <[2>oh okay <.>so we <.>c we can we can build the wall and then excavate <&>22:00 a hole and put THAT in <{><[>later <[>yeah it's not gonna take any <{><[>weight <.>so <[>i'm not sure how they put power poles in whether they ram them in or dig a hole but they well like i mean yeah <{><[>it doesn't have to be right up against the wall anyway <[>well that can go anywhere anyway <.>it's yep okay it can be a a metre or so <{><[>off the slab <[>mm next thing to consider the <.>j i just hadn't thought about this up to this point but the crusher okay it feeds in there's a little ramp there and it <.>s um the barrel there and then it discharges the skins <.>and i mean the the leaves and sticks and things here we're gonna need to be able to get rid of <.>b have a fruit bin there or something which collects all of that right or a trailer backing a trailer under and then um take that away at the end of the day's crush how high is that cos remember the bank's still up here yeah yeah well it's okay we can turn that <{><[>round but then you have to make a bigger slab going out THAT way <,,> mm <[>it's word you'd probably get problems with flooding as well <&>23:00 mm what this filling up or <{><[>this all going soggy <[>yeah well when you get heavy rain any water goes up there you've only got a hundred millimetres clearance oh yeah that <{><[>oh <.>s sorry coming out from the <.>s stream <[>yeah drain yeah coming UP from the stream filling it up that's not going to be a problem at vintage time we hope right march april no that's that's that's never a stream once we've cleared up a pond it doesn't back up there that's the that's the whole point of clearing up pond so that will <.>be that whole ditch what's now a a a drainage ditch will just be graded into <.>the yeah <{><[>i've no doubt it it will um <[>word like that get soggy no it'll be boggy <{><[>we're going to put field tiles through it field tiles under there <[>it'll it WILL flood sometime yeah to drain so yep tut that doesn't matter if you get a high intensity short duration storm it'll flood mhm mhm but i mean get runoff from the vineyard but then <.>sh <{><[>what what are we gonna do to get what yeah it's not going to do any harm and it's gonna be a hassle to do anything about it <&>24:00 <[>oh it's not gonna do any major damage mm yep okay so <.>f for <.>cl stalk clearing and that we're probably just looking at cutting down the the bank for the width of a trailer just a standard sort of car trailer type yeah thing to the same level as that so you can back your trailer down there tut so on the plan here we've got <,> the ramp <,> bin yep it sort of overhangs a metre either side of the ramp just a <,> yeah cos it's five long the ramp'll be about three wide whatever's appropriate for the trucks i think they want it a bit wider than that they want it <{><[><.>s <[>you ought to be able to stand beside it actually yeah they want something like as much either side a metre either <{><[>side of the truck <[>mm what's the standard truck width tut word about nine feet wide say three metres ish so tut yeah it's gonna be four metres <{><[>four and a half metres wide anyway <[>mm mm mhm at the mission their ramp is as wide as their receival bin mm which is five metres yeah <&>24:58